Update April 2011
The old siding and cabinets have been removed. The Seniors leveled the kitchen floor and cabinets are being installed. They have also begun to install the new energy efficient windows.
11/2010 All cabinets are in with the exception of the island. All windows are in,including the bay. The front door and island will hopefully be installed before the winter break.
1/14/2011 The island and front door are in. Granite countertops are installed. Nice! We will be working with HVAC installling the radiant flooring. Juniors have begun installing the new vinyl siding.
4/14/2011 Windows are trimmed and we are installing the soffit and crown molding in the kitchen. Most students are busy installing the siding and wrapping the trim. Things are looking good.