Notify Me When Page is Updated
Login To SchoolRackSign Up for an Account

CADD 10th Back to All Pages »

10th Grade Class Materials


May 6th 2010 Plane Project  Click for information

 

COMPLETED PROJECT CONSITS OF:                                                 APPROXIMATE NO. DRAWINGS:
DETAIL & ASSEMBLY DRAWING – FRONT FACE                                  1 ( OR 2)

DETAIL  & ASSEMBLY DRAWING – DRAWERS  1,2,3                            3 (OR 6)

DETAIL   - DOORS (2)                                                                                 2

DETAIL – DRAWER HANDLE – 1                                                              1

DETAIL & ASSEMBLY DRAWING – TOE KICK                                          1 ( OR 3)

DETAIL & ASSEMBLY DRAWING – FINAL CABINET                                1

 

Assignments:

Auxiliary Views:

AM - Lectures / Presentations given on:

Unit 13.1, 13.2, 13.3, (demo done on Autocad for unit 13.4) 13.6, 13.8,

Assignments: These drawings allow practice and experience on projecting a range of geometric forms. Create Drawings, Front, Top, Right, Auxiliary, Isometric views, label the Type of Auxiliary view (height, width, depth 13.3); fully dimension drawings, Use layers.

Date: Done?   Book: Page No: Prog:
March 15,2010     BTD 286 1 ac
March 15,2010     BTD 286 2 ac
March 15,2010     BTD 286 3 ac
March 15,2010     BTD 286 4 ac
March 15,2010     BTD 286 5 ac
March 15,2010     BTD 286 6 ac
March 15,2010     BTD 286 7 ac
March 16,2010     BTD 286 8 ac
March 16,2010     BTD 286 9 ac
March 16,2010     BTD 286 10 ac
March 16,2010     BTD 286 11 ac
March 16,2010     BTD 286 12 ac
March 16,2010     BTD 286 13 ac
March 16,2010     BTD 286 14 ac
March 17,2010     BTD 286 15 ac
March 17,2010     BTD 286 16 ac
March 17,2010     BTD 286 17 ac
March 17,2010     BTD 286 18 ac
March 17,2010     BTD 286 19 ac
March 17,2010     BTD 286 20 ac
March 17,2010     BTD 286 21 ac
March 18,2010     BTD 286 22 ac
March 18,2010     BTD 286 23 ac
March 18,2010     BTD 286 24 ac
March 18,2010     BTD 286 25 ac
March 18,2010     BTD 286 26 ac
March 18,2010     BTD 286 27 ac
March 18,2010     BTD 286 28 ac
March 19,2010     BTD 286 29 ac
March 19,2010     BTD 286 30 ac
March 19,2010     BTD 286 31 ac
March 19,2010     BTD 286 32 ac
March 19,2010     BTD 286 33 ac
March 19,2010     BTD 286 34 ac
March 19,2010     BTD 286 35 ac

These assignements will give students the opportunity to practice their orthographic view projection and dimensioning skills.

Book: Basic Technical Drawing.

Program Autocad.

USE: Layers, Layouts, Text  styles (Annotative); Dimension Styles (Annotative)

On Paperspace: be sure Each drawing view is on its Own view. Align and scale views properly.

Draw views as needed, fully dimension using proper dimensioning practice.

Create your Dimensioning Style which has the same units, and decimal places (where decimal) as the drawing in the book.

Page 163  Figure:1

Page 163  FIgure 2

Page 163  Figure 3

Page 163  Figure 4

(The Fun One) Page 167 Figure 8-44.

 

 

 

Click on Links below for more information:

http://students.autodesk.com/?nd=or&id=14804&ic=0ANwS5buul

 

Store Auxiliary View Powerpoints here: (Link Below)

Folder is under Powerpoint   /   Auxiliary_Views_2010

---Click Here for Link---

 

Book Online:
http://books.google.com/books?id=KHtq8-oxrNEC&pg=PA5&lpg=PA5&dq=c-size+border+title+block&source=bl&ots=BYTEtCO4UY&sig=8DKl5nWIOi1GfpC5OiXYCSxhBl8&hl=en&ei=IzGhSrXXEaqw8QawsNDlDw&sa=X&oi=book_result&ct=result&resnum=1#v=onepage&q=c-size%20border%20title%20block&f=true


 Excel Work Record: Complete Work Record Daily. 

The Work record is a list of All work done, hours, times, kept daily. In Industy this is used to help account for charges to various customers. Keep accurate work records is a critical skill and one which should be ongoing. Use the attaced file - download it, rename it into your own file.

_________________________________________________________________

 09-28-09 Assignment:  Create each of these files using Polar Coordinates.

Be sure to Dimension, using paperspace. Assume that each file is 1/2" thick.

Work List Here (Note this is a Partial list, more drawings will be given following completion.

 

 

 _________________________________________________________________

Section View Terms 


Fun Section View Questions to Think About 


   Annotative Text and Dimension Styles


 

Class Assignments:


 

10-27-08_(week) Section View Class Work


11-06-08 Reverse Engineered Symmetrical Parts / Section Views2


11-10-08  Section View Class Work


12-03-08 Auxiliary Views

Work: Make complete drawings BTD pg. 286 #1,2,3 Do Complete at end of class

Must be Signed before end of class.

 


Assignments 12-04

These assignment reinforce the skill of projecting Auxiliary views.


12-05

Auxiliary Views - Terms - Homework

 


12-08-05   Auxiliary Views: Pg 286 No. 13, 14 Due: 9.45 AM SIGNED

 -> Be sure to have print out your Excel Assignment Task Sheet and have it signed.

9.45 Start Discussion: Clock Project


01-06-09  Numbering Systems

CAD - Drawings: Class work: Section Views - Modeling using Inventor;

Create: BTD: Pg. 270, no 1 thru 6 All

Create Front and Full Section Views.


01-08-09

CAD - Drawings: Class work: Section Views: Model using Inventor:  

No 7,8,9.


 01-07-09 Friday!

CAD Drawings: Class Work: Today we will do Auxiliary views on Inventor!

Page: 287 No 2,3,4 <--- These are challenging parts which require use of Work Planes and Axes.   Page 288 No. 3,4


02-02-09  Archimedes Water Wheel   Screw Threads

 


02-05-09    Auxiliary Views

Please watch these Powerpoints following class discussions and reading the material.

Inclined Surfaces   The Auxiliary View     The Three Auxiliary Views

The Depth Auxiliary View     The Height Auxiliary View     The Width Auxiliary View

Revolving the Drawing    Reference Planes   Plotted Curves on Auxiliary Views

Partial Auxiliary Views    Angles in Auxiliary Views   Auxiliary Sections

True Length of a Line     Secondary Auxiliary Views    

Assignment: BTD02_13-25   BTD_13_26


02-09-09   Create Auxiliary Views using the Type specified


02-10-09    Auxiliary Views:  BTD pg 288 Fig 13-21 number 2,  BTD pg 291 FIg 13-34, BTD pg 290 fig 13024,  


03-20-09 Thread Powerpoints. Click on Name, Open or Download.

Threads and Fasteners Powerpoints


04-21-90

Revit Tutorials

Download_try

 File1

File2

File3